Why does this matter?

Because it was to be one of the final steps and it happened.

This was the storage shed at the Inn. It was used during construction and was full, and I mean full! Thanks to the help of Tyler and Azalea it has been emptied. Thanks to Mika, from Crestwood Storage Buildings, it’s been moved. It served it’s purpose well. It was originally purchased Crestwood Storage Buildings. This building is very sturdy and weather tight. At it’s new location it will be well used. It will begin by housing the flooring that came out of the Inn. The previous shed location will become parking at the Inn.

Remember the railings? These are patterned after the original wooden rails. The wooden rails were in need of very expensive restoration and would have been high maintenance. These are fabricated of steel. The upstairs rail is elongated height wise. The original upstairs rail was short. It did not meet code. It made me nervous to be out there with a child. The Inn is kid friendly. It needs to as safe as possible. The rails will be powder coated. They will need little maintenance.

Did you notice? The house changed color. It is no longer primer yellow. It is sail white. Doors will be next.

Three sides of the house, painted white, as she always was. The doors are only primed in these photos.