Really? A pandemic? Where do we go from here?
/So much work has been done. We carry on. If the Inn were ready, we couldn’t be hosting guests. How long will this last? When will the Inn be ready?
Todd, the awesome contractor, has heroically, and carefully carried on. He still goes to Inn. He visits early, not meeting with others in person. He checks on the job. He made sure to get all the materials for the tile job on site, so the tile guys could carry on. This is huge. In a time when the economy could be headed for the darkest time in my 67 years, the Inn is supplying three guys with work. That’s three less people in the unemployment line, at least or a couple weeks.
Tile, durock, thinset & grout! Oh boy. This was a job just getting it all in the house. It’s not even all pictured here. In a couple weeks the tile job should be complete.
The fireplace hearth has been trimmed. The front parlor floor tile is carefully being installed.
This is the downstairs shower. Note the cubby and corner seat. You must visualize the spacers removed, or not. We’ll have pictures soon enough.
This tile will surround the claw foot tub that has been in the house since the first time plumbing came in.